Midac Role

MIDAC in FLEXIndustries project holds the role of technical provider of an Energy Storage System in SUANFARMA plant located in Rovereto (TN).

MIDAC is involved to design and deploy a large Energy Storage System into the Italian pilot site.

Partner Involved

Partner: 34 with 23 Companies and 11 Reseach Centers involved
Project Budget: Over 17Mil€

Energy Storage System Size:

  • Capacity: 400 kWh

  • Power: 400 kW

  • Connection: Medium Voltage

Project Outcome:

  • Develop a BESS system
  • Design and Manufacturing BESS
  • Elaborate the final technical drawing for the BESS deploy inspection, testing, quality control and definition of installation guidelines.
  • Solution validation