HESTIA Project

HESTIA Project

Midac Role

HESTIA aims to provide a cost-effective solution for the next-generation DR services which will leverage the consumer engagement, energy and non-energy services, while dealing with both energy supply and demand side in a holistic manner.

MIDAC is the technical provider for the Italian and Dutch Pilots (located in Berchidda – Sardinia and Voorhout – Netherland), and it will provide residential and community battery in a Demand Response scenario

Partner Involved

Partner: 19 with 11 Companies and 8 Research Centers involved
Project Budget: 6Mil€

Energy Storage System Size:

  • Residential Solution (Berchidda)

  • System Installed: 20 Residential BESS

  • Solution Provided: 20 x Li-ion 51,2Vdc 5,1kWh

  • Community Battery (Voorhout)

  • System Size: 50 kW / 82 kWh

  • Battery DC Voltage: 410 Vdc

Project Outcome:

  • Develop a High Voltage Energy Community Battery
  • Integration residential and HV Solution with the project platform